Supply of 1.5 KWP off grid solar power pack System on P.H.C. Building
0
0
Supplying, Installing, testing and commissioning of 1.5 KWP off grid solar power pack System on P.H.C. Building at Pargaon Tq. Washi Dist. Osmanabad G.P. Level for 2019-2020 )
For more information please see below link:
Related posts:
- Execution of Roof Top Solar Energy Harnessing works of capacity 500 KWp at Head Quarter
- Repairing of solar street light pole with replacement of LED fittings, controller and accessories
- Operation and Maintenance of 509.355 KWp Solar Power Plant installed at 33/11kV Substation, Wavi, Nasik, Maharashtra
- Construction of Solar Based Rural Water Supply Scheme with 4000 Ltrs. Capacity RCC Water Storage Tank