
Supply of Balance of System, Installation Erection, Testing, Commissioning, and AMC for 5years for Solar Power Plant to be installed on Non AC Railway Coaches
36
0
Supply of Balance of System, Installation Erection, Testing, Commissioning, and AMC for 5years for Solar Power Plant to be installed on Non AC Railway Coaches
For more information please see below link:
Related posts:
- SITC of Solar power plant (Off Grid) of capacity (2 KWp at Kondagaon PO and Balod PO) and 1 KWp at Basana Post Office, Chhattisgarh Circle.
- Supply, installation, Testing and commissioning of 265w roof top Solar PV modules in place of damaged PV modules in HSB, MSB and BSB in IIT Madras
- Solar Plants at Terminals
- REPAIR OF SOLAR WATER HEATER AND SOLAR LIGHTS