
Supply of Grid Tied Central Solar Inverter with all necessary accessories with 5 years on site Warranty and 20 years maintenance in the State of Gujarat Telengana and Maharashtra
44
0
Supply of Grid Tied Central Solar Inverter with all necessary accessories with 5 years on site Warranty and 20 years maintenance in the State of Gujarat Telengana and Maharashtra
For more information please see below link:
Related posts:
- Design, Supply, Installation , Testing and Commissioning of the Rooftop Based Solar Photo-Voltaic (SPV) project of 200 KWp capacity at ALTTC Ghaziabad, including, Operation and Comprehensive Maintenance (O/M) for a period of 25 years on RESCO mod
- Solar Based Dual Pump Mini Water Supply Scheme On Existing Borewell
- 30 KW Solar Light system supply and Fixing Work
- Constn of Solar powered MDTW I_Schemes under SOPD_2018_19 in Biswanath district Grp II