Supply of Ground Mounted Solar Power Plant total 50 KWp capacity
0
0
Design Supply Installation Testing and Commissioning with five years comprehensive maintenance contract of Controller Based Ground Mounted Solar Power Plant total 50 KWp capacity for Existing Water Supply Pumps with 112 meter
The last date to submit the bids is January 8, 2021
For more information please see below link:
Related posts:
- MEDA FLOATS TENDER OF TOTAL 88 KW CAPACITY GRIDCONNECTED SOLAR PV POWER PLANT AT VARIOUS 22 PHC WASHIN
- MEDA Issues Tender To Supply 5kW Solar Power Plant At Amravati
- MEDA Invites Bids to Set Up a Renewable Energy Park for Tourists in Maharashtra
- MEDA Float Tender for 245 kw Solar Pv Power Plant and 430 nos solar LED street lights
tags:
MEDA