1. Home
  2. Tag "1110 MW"

Petition for adoption of tariff for the 1110 MW Wind-Solar Hybrid Power Projects (Tranche-III) connected to the ISTS and selected through Competitive Bidding Process as per the Guidelines of MNRE, Government of India – EQ Mag Pro

Petition for adoption of tariff for the 1110 MW Wind-Solar Hybrid Power Projects (Tranche-III) connected to the ISTS and selected through Competitive Bidding Process as per the Guidelines of MNRE, Government of India. For more information please see below link:

Petition of the CERC (Sharing of inter- State Transmission Charges and Losses) and (Deviation Settlement Mechanism and related matters) Regulations, 2022 – EQ

Petition for adoption of tariff for the 1110 MW Wind-Solar Hybrid Power Project (Tranche-III) connected to the inter-State Transmission System – EQ Mag Pro

Petition for adoption of tariff for the 1110 MW Wind-Solar Hybrid Power Project (Tranche-III) connected to the inter-State Transmission System. For more information please see below link:

Petition of the CERC (Sharing of inter- State Transmission Charges and Losses) and (Deviation Settlement Mechanism and related matters) Regulations, 2022 – EQ