1. Home
  2. Tag "1200 MW"

BSUL Issue Tender for EoI FOR DEVELOPMENT OF 1200 MW SOLAR PV POWER PROJECT IN ULTRA MEGA RENEWABLE ENERGY POWER PARK, UTTAR PRADESH – EQ Mag Pro

BSUL Issue Tender for EoI FOR DEVELOPMENT OF 1200 MW SOLAR PV POWER PROJECT IN ULTRA MEGA RENEWABLE ENERGY POWER PARK, UTTAR PRADESH. For more information please see below link:

NTPC issue Tender for SITC, O&M for 5 years of grid connected Rooftop Solar PV system Capacity 750 KWp(DC) at St-2NTPC Barauni – EQ

GIPCL Issue Tender for Supply of Pooling Substation 400/33 Kv, 1200 Mw (Pss-1, Phase-i & Phase-ii Of 600 Mw Each ) Of Solar/ Wind / Hybrid Re Park Of 2375 Mw Capacity At Great Rann Of Kutch Area, Gujarat – EQ Mag Pro

GIPCL Issue Tender for Supply of Pooling Substation 400/33 Kv, 1200 Mw (Pss-1, Phase-i & Phase-ii Of 600 Mw Each ) Of Solar/ Wind / Hybrid Re Park Of 2375 Mw Capacity At Great Rann Of Kutch Area, Gujarat. For more information please see below link:

NTPC issue Tender for SITC, O&M for 5 years of grid connected Rooftop Solar PV system Capacity 750 KWp(DC) at St-2NTPC Barauni – EQ

Petition for adoption of tariff for 1200 MW Wind Power Projects (Tranche-X) connected to the Inter-State Transmission System and selected through competitive bidding process – EQ Mag Pro

Petition for adoption of tariff for 1200 MW Wind Power Projects (Tranche-X) connected to the Inter-State Transmission System and selected through competitive bidding process. For more information please see below link:

In the matter of the Electricity Act. for adoption of tariff under PM KUSUM – C Scheme of Government of India – EQ

Petition for determination of generation tariff of 1200 MW Dgen Mega Power Project of Torrent Power Limited for the 2019-24 tariff period – EQ Mag Pro

Petition for determination of generation tariff of 1200 MW Dgen Mega Power Project of Torrent Power Limited for the 2019-24 tariff period. For more information please see below link:

In the matter of the Electricity Act. for adoption of tariff under PM KUSUM – C Scheme of Government of India – EQ

Petition for determination of tariff of 1200 MW coal-based power project of Jindal India Thermal Power Limited for the period from 12.2.2015 to 31.3.2019 – EQ Mag Pro

Petition for determination of tariff of 1200 MW coal-based power project of Jindal India Thermal Power Limited for the period from 12.2.2015 to 31.3.2019. For more information please see below link:

In the matter of the Electricity Act. for adoption of tariff under PM KUSUM – C Scheme of Government of India – EQ