1. Home
  2. Tag "300 MW"

MGVCL Issue Tender for supply of 300 MW Grid-Connected Rooftop Solar Plant of various capacities under the Phase-II – EQ Mag Pro

MGVCL Issue Tender for supply of 300 MW Grid-Connected Rooftop Solar Plant of various capacities under the Phase-II of Grid Connected Rooftop Solar Scheme of MNRE /SURYA Gujarat Scheme in the State Gujarat during the Year (2021-22) for Residential Consumers in Rural Area.  For more information please see below link:

Ministry of Railways Issue Tender for Supply of 1 MW Solar Power Plant over the Prayagraj Division – EQ

China’s Jinko Power wins 300 MW Saad solar PV power project in Saudi Arabia – EQ Mag Pro

The project was tendered under Round 3 of Saudi’s National Renewable Energy Programme China’s Jinko Power Technology Co said on Monday that a consortium led by its subsidiary Jinko Power (HK) Company has won the bid for the 300-megawatt Saad Solar Photovoltaic (PV) Independent Power Project (IPP) in Saudi Arabia. The project is part of […]

Hydrogen subsidies | Australian solar-to-methanol project secures €24m grant — with half coming from Germany -EQ

Uzbekistan Issues Tender for Supply of 300 MW Solar Project – EQ Mag Pro

The Ministry of Energy of Uzbekistan (MOE) is pleased to announce the launch of the Request for Qualifications for the Guzar Solar PPP Project (the Project) with a capacity of up to 300MWac. The Project is the second project under the 1GW Solar Program being developed by the Government of the Republic of Uzbekistan (GOU) […]

Ministry of Railways Issue Tender for Supply of 1 MW Solar Power Plant over the Prayagraj Division – EQ

Commissioned 300 MW project for Azure Bikaner SECI 600 ISTS – EQ Mag Pro

Probably my first post on linkedin but a much awaited one. I am thrilled to state that, We have commissioned 300 MW project for Azure Bikaner SECI 600 ISTS . I feel myself very fortunate to lead this project from Voltas. The project has been a roller coaster ride due to COVID but we were […]

Operational Guidelines for Implementation of Component ‘Incentives to Discoms’ under PM-Surya Ghar Muft Bijli Yojana – EQ

Renew Power adds 300 MW; total capacity addition at 1.5 GW in FY22

Renew Power, which is traded on the Nasdaq exchange, has commissioned a 300 megawatt SECI solar project in Rajasthan, taking its total operating asset to a record 7.4 gigawatt till date. The Gurugram-based company has installed a record 1.5 GW of renewable energy projects so far this fiscal year despite the pandemic challenges and supply […]

Budget 2024 must further India’s clean energy goals. Climate change is an economic problem – EQ

Tata Power receives ‘Letter of Award’ from MSEDCL for setting up of 300 MW Hybrid(Wind & Solar) Project – EQ Mag Pro

TP Saurya Limited (TPSL),a wholly owned subsidiary of Tata Power has been awarded the project through Tariff-based competitive bidding National, India, 16th December, 2021: TP Saurya Limited (TPSL), a wholly owned subsidiary of Tata Power, received the ‘Letter of Award’ (LoA) from Maharashtra State Electricity Distribution Company Limited (MSEDCL) for setting up of 300 MW […]

Operational Guidelines for Implementation of Component ‘Incentives to Discoms’ under PM-Surya Ghar Muft Bijli Yojana – EQ

Construction Begins for 300 MW Integrated PV Projects in Guangdong Worth Over RMB 1.5 Billion – EQ Mag Pro

Chinese news platform Nanfang Daily reported on November 27 that construction has commenced for a series of PV projects located in Gaozhou, a county-level city administered as a part of prefecture-level city Maoming in Guangdong Province. The project developer is Guangdong Electric Power, a subsidiary of State Power Investment Corporation. These projects will be integrated […]

Hydrogen subsidies | Australian solar-to-methanol project secures €24m grant — with half coming from Germany -EQ

MSEDCL Issue e-tender for long term bids for Procurement of 300 MW Wind Power from New Projects through Tariff Based Competitive bidding process – EQ Mag Pro

MSEDCL Issue e-tender for long term bids for Procurement of 300 MW Wind Power from New Projects through Tariff Based Competitive bidding process. For more information please see below link:

Ministry of Railways Issue Tender for Supply of 1 MW Solar Power Plant over the Prayagraj Division – EQ