Ministry of Power chalks out comprehensive plan for evacuation of power from the planned renewable capacity by 2030 The plan envisages additional transmission system and installation of battery energy storage capacity MoP constitutes a high-level Committee to plan transmission system required for having 500 GW of non-fossil fuel based installed capacity by 2030 The Committee […]