1. Home
  2. Tag "500 MW"

Grew Energy to supply 500 MW solar modules for Jindal Renewables’ solar project – EQ

In Short : Grew Energy has signed an agreement to supply 500 MW of solar modules for Jindal Renewables’ solar project. This collaboration aims to support the expansion of renewable energy capacity, contributing to India’s clean energy goals and enhancing sustainable energy production. In Detail : Grew Energy has announced plans to supply 500 MW […]

Jindal Saw to acquire 31.20 pc stake in ReNew Green Energy for undisclosed amount – EQ

NTPC Wins 500 MW Solar Project in SECI Auction – EQ

In Short : NTPC has won a 500 MW solar power project in a Solar Energy Corporation of India (SECI) auction. The project, set to enhance India’s renewable energy capacity, reflects NTPC’s commitment to sustainable energy and its role in meeting the country’s clean energy goals. The win strengthens NTPC’s position in the growing solar […]

Jindal Saw to acquire 31.20 pc stake in ReNew Green Energy for undisclosed amount – EQ

IMPORTANT: Pre-bid meeting- RfS for Setting up of 500 MW ISTS-connected Offshore Wind Power Project in India (Tranche-I) – EQ

With reference to the RfS issued for Setting up of 500 MW ISTS-connected Offshore Wind Power Project in India (Tranche-I), the pre-bid meeting has been scheduled on 06.12.2024, at 03:00 PM (IST). The meeting will be conducted in Hybrid (Offline-Online) mode. Prospective bidders interested in participating in the meeting may intimate the names and email ids of respective participants […]

ADB, TBS Sign Deal to Expand Sustainable Transportation in Indonesia – EQ

Tamil Nadu to Unveil First Tender for 500 MW Solar Project – EQ

In Short : Tamil Nadu is set to release its first tender for a 500 MW solar project, a significant step in expanding the state’s renewable energy capacity. The initiative aims to attract developers, boost solar power generation, and contribute to India’s renewable energy targets. This project aligns with the state’s efforts to reduce fossil […]

Government wants banks to up renewable energy financing, minister to meet bankers in January – EQ

Petition for determination of Tariff on installation of various ECS at Feroze Gandhi Unchahar Thermal PS, Stage-IV 500 MW – EQ

Petition for determination of Tariff on installation of various ECS at Feroze Gandhi Unchahar Thermal PS, Stage-IV 500 MW For more information please see below link:

In the matter of CERC (Procedure, Terms and Conditions for Grant of Transmission Licence and other related matters) Regulations, Transmission Licence to Rajasthan IV C Power Transmission Limited – EQ

In the matter of revision of tariff for the period 2014-19 in respect of Farakka Super Thermal Power Station Stage-III (500 MW) – EQ

In the matter of revision of tariff for the period 2014-19 in respect of Farakka Super Thermal Power Station Stage-III (500 MW) For more information please see below link:

In the matter of CERC (Procedure, Terms and Conditions for Grant of Transmission Licence and other related matters) Regulations, Transmission Licence to Rajasthan IV C Power Transmission Limited – EQ

SJVN Green Energy Limited Issue Tender for setting up Solar Power Project(s) upto cumulative capacity of 500 MW At Bikaner-IV Pooling Station – EQ

SJVN Green Energy Limited Issue Tender for setting up Solar Power Project(s) upto cumulative capacity of 500 MW At Bikaner-IV Pooling Station For more information please see below link: Tender Documents Date and Time of Start of Procurement of Tender Documents 27-Sep-2024 18:00:00 RTZ Corresponding Local Date and Time Not Applicable Date and Time of […]

Central Govt. Ministry issue Tender for PITC of 25 KWp off grid solar power plant at 10 BOPs of SHQ BSF Jammu, under FTR HQ Jammu – EQ