SECI Issue Tender for O&M of 7.5 MW (AC) Solar PV Power Plant at Badi Sid, Rajasthan – EQ

Owner: Solar Energy Corporation of India Limited (SECI), New Delhi, India Contract title: Tender for Design, Engineering, Supply, Construction, Erection, Testing and Commissioning along with 10 years of O&M of 7.5 MW (AC) Solar PV Power Plant at Badi Sid, Rajasthan Tender No: SECI/C&P/OP/11/015/2024-25 ETS ID: SECI-2024-TN000032 CPPP ID: 2024_SECI_762654_1 The Bidding documents in English […]

Ministry of Railways issue Tender for Provision of renewable solar on grid plant on roof top at Khurda Road Division – EQ

SECI Issue Tender for O & M of 7.5 MW (AC) Solar PV Power Plant at Badi Sid, Rajasthan – EQ

Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India Tender title: Design, Engineering, Supply, Construction, Erection, Testing and Commissioning along with 10 years of O&M of 7.5 MW (AC) Solar PV Power Plant at Badi Sid, Rajasthan. Tender number: SECI/C&P/OP/11/015/2024-25 The Bidding documents in English for Design, Engineering, Supply, Construction, Erection, Testing and […]

Ministry of Railways issue Tender for Provision of renewable solar on grid plant on roof top at Khurda Road Division – EQ

Petition for approval of source by the Hon’ble Commission from 7.5 MW captive solar power plant of M/s Orbit Resorts Limited at village Balasar, Haryana – EQ Mag Pro

Petition for approval of source by the Hon’ble Commission from 7.5 MW captive solar power plant of M/s Orbit Resorts Limited at village Balasar, Haryana. For more information please see below link:

Petition for adoption of transmission charges with respect to the Transmission System being established by Rajasthan IV E Power Transmission Limited – EQ

7.5 MW of battery storage for gold mine – EQ Mag Pro

System integrates hydroelectric power stations, 36 diesel generator sets Barrick Gold Corp. and Caterpillar dealer Tractafric have installed 7.5 MW of battery energy storage capacity for the company’s microgrid at the Kibali gold mine in the Democratic Republic of the Congo (DRC). Tractafric’s solution deploys the battery energy storage and Cat bi-directional power inverters (BDP) […]

Battery Energy Storage Systems: A Clean Energy Solution NY Needs -EQ

MSR Mega Bio-Power Has Filed a Petition Seeking Determination of the Tariff For the Industrial Waste Based Power Plant of 7.5 MW

MSR Mega Bio-Power Has Filed a Petition Seeking Determination of the Tariff For the Industrial Waste Based Power Plant of 7.5 MW. For more information please see below link:

Petition for adoption of transmission charges with respect to the Transmission System being established by Rajasthan IV E Power Transmission Limited – EQ