Petition for determination of transmission tariff for the 2019-24 tariff period in respect of one no. of asset under “Additional System for Power Evacuation at Raigarh (Tamnar) Pool – EQ Mag March 15, 2023 Anand Gupta 000 Policy & Regulation Petition for determination of transmission tariff for the 2019-24 tariff period in respect of one no. of asset under “Additional System for Power Evacuation at Raigarh (Tamnar) Pool. For more information please see below link: Read more Petition of the CERC (Connectivity and General Network Access to the ISTS) Regulations – EQ