1. Home
  2. Tag "AECOM and Lockheed Martin to enhance energy resilience at Fort Carson with DoD’s largest peak-shaving battery"

AECOM and Lockheed Martin to enhance energy resilience at Fort Carson with DoD’s largest peak-shaving battery

LOS ANGELES: AECOM, a premier, fully integrated global infrastructure firm, announced today that it has begun construction of a Battery Energy Storage System (BESS) at Fort Carson, Colorado, using Lockheed Martin’s (NYSE : LMT ) GridStar® Lithium energy storage system. The 4.25 MW/8.5 MWh BESS is part of an energy savings performance contract (ESPC) project to reduce Fort Carson’s energy costs and increase its […]

Battery Energy Storage Systems: A Clean Energy Solution NY Needs -EQ