1. Home
  2. Tag "ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION"

Determination of Variable Cost – In respect of the existing Biomass, Industrial Waste and Bagasse based plants

Determination of Variable Cost for the period from 01-04-2019 to 31-03-2024 in respect of the existing Biomass, Industrial Waste and Bagasse based plants For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations by Central Transmission Utility of India Limited of 200 MW connectivity – EQ

Transmission Scheme for evacuation of power from Polavaram Hydro Electric Power project 960 MW

Transmission Scheme for evacuation of power from Polavaram Hydro Electric Power project (12 x 80) 960 MW For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations by Central Transmission Utility of India Limited of 200 MW connectivity – EQ

Plea of renewable firms: APERC public hearing on December 31

The Andhra Pradesh Electricity Regulatory Commission (APERC) is set to hold public hearings on the petitions filed by a few private renewable energy companies on December 31. VIJAYAWADA: The Andhra Pradesh Electricity Regulatory Commission (APERC) is set to hold public hearings on the petitions filed by a few private renewable energy companies on December 31. […]

Andhra Pradesh to Develop Two Large-Scale Solar Plants in Prakasam District to Boost Renewable Energy Capacity – EQ

Stay granted staying further proceedings on the file of Andhra Pradesh Electricity Regulatory Commission

  Stay granted staying further proceedings in OP No. 66 of 2019 on the file of Andhra Pradesh Electricity Regulatory Commission For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations by Central Transmission Utility of India Limited of 200 MW connectivity – EQ