e-RA for assured Peak supply of 8000 MWh (2000 MW x 4 Hrs.) from ISTS-Connected RE Projects (SECI-FDRE-VI) – EQ January 3, 2025 Anand Gupta 000 Featured e-RA for assured Peak supply of 8000 MWh (2000 MW x 4 Hrs.) from ISTS-Connected RE Projects (SECI-FDRE-VI) For more information please see below link: Read more Sineng Electric Delivers Advanced Grid-Forming Energy Storage Solution for High-Altitude Project in Tibet – EQ