1. Home
  2. Tag "Barauni Thermal Power Station"

NTPC total installed capacity rises to 57,356 MW

  NTPC Ltd. India’s largest power generation company, has added 250 MW capacity at its Barauni Thermal Power Station in Bihar. With this addition, the total capacity of NTPC Barauni now stands at 470 MW. The total installed capacity of NTPC and NTPC group is now 48,895 MW and 57,356 MW respectively. Source: ntpc.co.in

APEPDCL Unveils Plan to Drive Extensive Solar Power Adoption Across Andhra Pradesh – EQ