1. Home
  2. Tag "CENTRAL ELECTRICITY REGULATORY COMMISSION"

Petition for adoption of tariff for 1150 MW Solar PV Power projects (Tranche-IV)

  Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for 1150 MW Solar PV Power projects (Tranche-IV) connected to the Inter-State Transmission system (ISTS) and selected through competitive bidding process as per the Standard Bidding Guidelines dated 3.8.2017. Solar Energy Corporation of India Limited For more information please see below […]

Inviting Comments/Suggestion on the draft STU’s Procedure for Grant of Long/medium Term Green Energy Open Access – EQ

Engagement of Consultants for “Development of AI Based Regulatory Expert System Tool (REST) for CERC”

  Engagement of Consultants for “Development of AI Based Regulatory Expert System Tool (REST) for Central Electricity Regulatory Commission”. (Online pre-bid meeting on 8th January, 2021 at 1500 hrs.) (Last date:- 20.01.2021) For more information please see below link:  

Inviting Comments/Suggestion on the draft STU’s Procedure for Grant of Long/medium Term Green Energy Open Access – EQ

Cabinet approves MoU between India and USA for exchange of information in areas of mutual interest in the electricity sector

The Union Cabinet, chaired by the Prime Minister, Shri Narendra Modi, has given its approval for Central Electricity Regulatory Commission’s proposal for entering into a Memorandum of Understanding between Central Electricity Regulatory Commission (CERC), India and Federal Energy Regulatory Commission (FERC), United States of America (USA) for exchange of information and experiences in areas of […]

10 gram panchayats will go green: Himachal CM promises on I-Day – EQ

Petition filed by MP Power Management Co in connection with the disputes and differences arising due to breach of PPA

  Petition filed by Madhya Pradesh Power Management Company Limited under Sections 79(1)(c), (f), (k) and other applicable provisions of the Electricity Act, 2003 in connection with the disputes and differences arising due to breach of Power Purchase Agreement dated 8.8.2005 entered between it and Nuclear Power Corporation of India Limited and allowing the claim […]

Inviting Comments/Suggestion on the draft STU’s Procedure for Grant of Long/medium Term Green Energy Open Access – EQ

Petition for adoption of tariff for 440.8 MW Wind Power Projects (Tranche-VIII)

  Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for 440.8 MW Wind Power Projects (Tranche-VIII) connected to the inter-State Transmission System (ISTS) and selected through Competitive Bidding Process as per the Guidelines dated 8.12.2017. Solar Energy Corporation of India Limited (SECI) For more information please see below link:

Inviting Comments/Suggestion on the draft STU’s Procedure for Grant of Long/medium Term Green Energy Open Access – EQ

Petition seeking relief in time extension granted for commissioning of  50 MW Wind Power Project

  Petition under Section 79 read with Regulations 20 and 21 of the Central Electricity Regulatory Commission (Sharing of Inter State Transmission Petition under Section 79 of the Electricity Act, 2003 seeking relief in time extension granted for commissioning of Petitioner’s 50 MW Wind Power Project connected to Central Grid. For more information please see […]

Inviting Comments/Suggestion on the draft STU’s Procedure for Grant of Long/medium Term Green Energy Open Access – EQ

Petition for seeking recognition of Change in Law and Force Majeure events

Petition under Section 79 read with Regulations 20 and 21 of the Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010 read with Regulation 33A and 33B of the Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in Inter-State Transmission and related matters) Regulations, 2009 […]

Inviting Comments/Suggestion on the draft STU’s Procedure for Grant of Long/medium Term Green Energy Open Access – EQ