1. Home
  2. Tag "coal based unit"

IN THE MATTER OF: Detailed Operating Procedure for backing down of coal based unit (s) of the State Generating Stations having 100% installed capacity tied up HPPC/DISCOMs – EQ Mag Pro

IN THE MATTER OF: Detailed Operating Procedure for backing down of coal based unit (s) of the State Generating Stations having 100% installed capacity tied up HPPC/DISCOMs of Haryana and for IPPs as per provisions in PPA with HPPC/DISCOMs. For more information please see below link:

In the matter of adoption of Transmission Charges with respect to the transmission system being established by Khavda IV-E2 Power Transmission Limited – EQ