1. Home
  2. Tag "Dhariwal Infrastructure"

Petition of PPA entered into between Dhariwal Infrastructure Ltd. and TNGEDCO. for the supply of 100 MW Contracted Capacity from Unit 2 of its 2 x 300 MW Coal based thermal generating station located at Tadali – EQ Mag Pro

Petition of PPA entered into between Dhariwal Infrastructure Ltd. and TNGEDCO. for the supply of 100 MW Contracted Capacity from Unit 2 of its 2 x 300 MW Coal based thermal generating station located at Tadali. For more information please see below link:

In the Matter of UPERC the purposes of banking and withdrawal of banked energy – EQ