1. Home
  2. Tag "Dulhasti Power Station (390 MW)"

Petition for revision of tariff for the 2014-19 tariff period and determination of tariff for the 2019-24 tariff period in respect of Dulhasti Power Station (390 MW). NHPC Limited – EQ Mag Pro

Petition for revision of tariff for the 2014-19 tariff period and determination of tariff for the 2019-24 tariff period in respect of Dulhasti Power Station (390 MW). NHPC Limited. For more information please see below link:

Public Hearing on the Draft KERC Framework for Resource Adequacy Regulations 2024 – EQ