1. Home
  2. Tag "Dulhasti Power Station (390 MW)"

Petition for revision of tariff for the 2014-19 tariff period and determination of tariff for the 2019-24 tariff period in respect of Dulhasti Power Station (390 MW). NHPC Limited – EQ Mag Pro

Petition for revision of tariff for the 2014-19 tariff period and determination of tariff for the 2019-24 tariff period in respect of Dulhasti Power Station (390 MW). NHPC Limited. For more information please see below link:

Petition of Adani Power Limited for approval of Final True-up of ARR for 5th Control Period – EQ