1. Home
  2. Tag "Extension-IV of Bid Submission Deadline"

Extension-IV of Bid submission Deadline: Tender for Supply of 1680 MWp Domestically Manufactured Solar PV Modules with Domestically Manufactured Solar Cells – EQ Mag Pro

Extension-IV of Bid submission Deadline: Tender for the Manufacturing, Testing, Packing and Forwarding, Supply and Transportation of 1680 MWp Domestically Manufactured Solar PV Modules with Domestically Manufactured Solar Cells. Owner: Solar Energy Corporation of India Limited (SECI), New Delhi, India Tender No: SECI/C&P/OP/11/0001/2022-23 Tender Search Code (TSC): SECI-2022-TN000019 Extension of Bid submission Deadline: Existing Date […]

Exclusive | Will award 7.8 lakh tpa new green hydrogen production capacity in 2025: Pralhad Joshi – EQ

Extension-IV of Bid Submission Deadline: Supply of cumulative 44 MW (AC) ground based Solar PV Power Plant along with 10 years Plant O&M at different sites at SCCL – EQ Mag Pro

Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India Owner: Singareni Collieries Co. Ltd. (SCCL) Project: Innovation in Solar Power and Hybrid Technologies Project Contract title: Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of cumulative 44 MW (AC) ground based Solar PV Power Plant along with 10 years Plant O&M at different […]

Exclusive | Will award 7.8 lakh tpa new green hydrogen production capacity in 2025: Pralhad Joshi – EQ

Extension-IV of Bid Submission Deadline: Supply of 5 MW (AC) grid connected saffron based Agro-Solar PV Power Plant having 10 years plant – EQ Mag Pro O&M at Pampore, Pulwama, Jammu & Kashmir, India

Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India Project: Innovation in Solar Power and Hybrid Technologies Project Contract title: Design, Engineering, Supply, Construction, Erection, Testing, Commissioning and O&M of 5 MW (AC) grid connected saffron based Agro-Solar PV Power Plant having 10 years plant O&M at Pampore, Pulwama, Jammu & Kashmir, India. […]

Exclusive | Will award 7.8 lakh tpa new green hydrogen production capacity in 2025: Pralhad Joshi – EQ