Extension of timelines of the Scheme for “Developement of Solar Parks and Ultra Mega Solar Power Projects ” from 2019-20 to 2021-22-reg. July 4, 2018 Anand Gupta 000186 Featured Extension of timelines of the Scheme for “Developement of Solar Parks and Ultra Mega Solar Power Projects ” from 2019-20 to 2021-22-reg. For more information please see below link: Read more Results: RfS for 1350 MW ISTS-connected Wind Power Projects in India (SECI-Tranche-XVI) – EQ