1. Home
  2. Tag "Installation and Commissioning of Rooftop Solar Photovoltaic Systems on Net metering or Gross metering (as per KERC Regulations) at multiple locations owned by HDMC (approximately 340 kWp) Third Call"

Design, Supply, Installation and Commissioning of Rooftop Solar Photovoltaic Systems on Net metering or Gross metering (as per KERC Regulations) at multiple locations owned by HDMC (approximately 340 kWp) Third Call

Solar Rooftop:Design, Supply, Installation and Commissioning of Rooftop Solar Photovoltaic Systems on Net metering or Gross metering (as per KERC Regulations) at multiple locations owned by HDMC (approximately 340 kWp) Third Call For more information please see below link:

Ministry of Railways Issue Tender for Supply of 1 MW Solar Power Plant over the Prayagraj Division – EQ