1. Home
  2. Tag "Intimation"

Intimation of the tender Annulment: Tender for Selection of Agency for Outright Purchase or Lease of 800 acres of land for development of 200 MW SPV Project in Madhya Pradesh – EQ

Annulment of the Tender: Intimation of the tender Annulment: Tender for Selection of Agency for Outright Purchase or Lease of 800 acres of land for development of 200 MW SPV Project in Madhya Pradesh Owner: Solar Energy Corporation of India Limited (SECI), New Delhi, India Tender No: SECI/C&P/MI/00/05/2024-25 ETS ID: SECI-2024-TN000040 CPPP ID: 2024_SECI_768999_1 The […]

The smarter E India 2025: Record breaking edition at Gujarat, the new energy capital of India – EQ

Intimation of the Tender Annulment: Tender for supply, installation, testing and commissioning of Data logger and remote & local monitoring system for different sites of 1 MW (AC) Rooftop Solar PV Power Plants at Port Blair, Andaman – EQ

Annulment of the Tender: Intimation of the tender Annulment: Tender for supply, installation, testing and commissioning of Data logger and remote & local monitoring system for different sites of 1 MW (AC) Rooftop Solar PV Power Plants at Port Blair, Andaman, UT of Andaman & Nicobar, India Owner: Solar Energy Corporation of India Limited (SECI), […]

The smarter E India 2025: Record breaking edition at Gujarat, the new energy capital of India – EQ

Intimation of receiving Commissioning Certificate from GEDA for capacity of 6 MWdc Solar Power Plant under Captive Power Producer (‘CPP’): KPI Green Energy – EQ Mag

Intimation of receiving Commissioning Certificate from GEDA for capacity of 6 MWdc Solar Power Plant under Captive Power Producer (‘CPP’): KPI Green Energy. For more information please see below link:

The smarter E India 2025: Record breaking edition at Gujarat, the new energy capital of India – EQ

Intimation in accordance with the Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015, as amended (“Listing Regulations”) – EQ Mag Pro

Intimation in accordance with the Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015, as amended (“Listing Regulations”) in respect of the meeting of the Board of Directors of Borosil Renewables Limited (“Company”) to be held on July 14, 2022. For more information please see below link:

The smarter E India 2025: Record breaking edition at Gujarat, the new energy capital of India – EQ

KPI Green Energy: Intimation of receiving Commissioning Certificate from GEDA for capacity of 1.20 MWdc Solar Power Plant under Captive Power Producer {‘CPP’) – EQ Mag Pro

KPI Green Energy: Intimation of receiving Commissioning Certificate from GEDA for capacity of 1.20 MWdc Solar Power Plant under Captive Power Producer {‘CPP’). For more information please see below link:

The smarter E India 2025: Record breaking edition at Gujarat, the new energy capital of India – EQ

Intimation regarding withdrawal of the Draft Red Herring Prospectus (“DRHP”) filed by lnox Green Energy Services Limited (Earlier known as lnox Wind Infrastructure Services Limited (“IGESL”)

Intimation regarding withdrawal of the Draft Red Herring Prospectus (“DRHP”) filed by lnox Green Energy Services Limited (Earlier known as lnox Wind Infrastructure Services Limited (“IGESL”) For more information please see below link:

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulationse to NERGS-I Power Transmission Limited – EQ