1. Home
  2. Tag "Intimation"

Intimation of receiving Commissioning Certificate from GEDA for capacity of 6 MWdc Solar Power Plant under Captive Power Producer (‘CPP’): KPI Green Energy – EQ Mag

Intimation of receiving Commissioning Certificate from GEDA for capacity of 6 MWdc Solar Power Plant under Captive Power Producer (‘CPP’): KPI Green Energy. For more information please see below link:

IEA member governments update IEA Shared Goals with strong focus on energy security and clean energy transitions – EQ

Intimation in accordance with the Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015, as amended (“Listing Regulations”) – EQ Mag Pro

Intimation in accordance with the Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015, as amended (“Listing Regulations”) in respect of the meeting of the Board of Directors of Borosil Renewables Limited (“Company”) to be held on July 14, 2022. For more information please see below link:

IEA member governments update IEA Shared Goals with strong focus on energy security and clean energy transitions – EQ

KPI Green Energy: Intimation of receiving Commissioning Certificate from GEDA for capacity of 1.20 MWdc Solar Power Plant under Captive Power Producer {‘CPP’) – EQ Mag Pro

KPI Green Energy: Intimation of receiving Commissioning Certificate from GEDA for capacity of 1.20 MWdc Solar Power Plant under Captive Power Producer {‘CPP’). For more information please see below link:

IEA member governments update IEA Shared Goals with strong focus on energy security and clean energy transitions – EQ

Intimation regarding withdrawal of the Draft Red Herring Prospectus (“DRHP”) filed by lnox Green Energy Services Limited (Earlier known as lnox Wind Infrastructure Services Limited (“IGESL”)

Intimation regarding withdrawal of the Draft Red Herring Prospectus (“DRHP”) filed by lnox Green Energy Services Limited (Earlier known as lnox Wind Infrastructure Services Limited (“IGESL”) For more information please see below link:

In the matter of adoption of Transmission Charges with respect to the transmission system being established by Khavda IV-E2 Power Transmission Limited – EQ