The cheapest U.S. solar PPAs have been coming out of places like West Texas, but developer 8minute Solar has put the spotlight back on California. The Los Angeles Department of Water and Power is preparing to approve a utility-scale solar-battery project that could shatter U.S. records to date, in terms of both storage capacity and […]
As LADWP’s partner and systems integrator, Doosan GridTech deployed this rapid-response transmission asset to achieve 100% system availability over 10 years despite the harsh Mojave Desert climate. SEATTLE: For their joint efforts in realizing Los Angeles Department of Water and Power’s (LADWP) first utility-scale BESS at its Beacon Solar Plant, the municipal utility and Doosan […]