The four-phased installation has reduced the cost of power from INR 8 per unit to estimated INR 2.11 per unit. This saves MIET approximately INR 70,90,000 per annum. Orb Energy (“Orb”) today announced that it has successfully installed and commissioned the fourth installation of a cumulative 728 kilowatt rooftop solar system at the Meerut Institute […]