Petition for revision of the scheduled generation of Nathpa Jhakri Hydro Power Station (6×250 MW) and Rampur Hydro Power Station (6 x 68.67 MW) of SJVN Limited For more information please see below link:
Petition for determination of tariff of Nathpa Jhakri Hydro Power Station (1500 MW) for the period from 1.4.2019 to 31.3.2024. For more information please see below link: