Benchmark costs for Off-grid Solar PV Systems and Solarisation of Grid Connected.Agricultural Pumps for the Year 2019-20 -reg. July 26, 2019 Anand Gupta 0+3-10 Featured Benchmark costs for Off-grid Solar PV Systems and Solarisation of Grid Connected.Agricultural Pumps for the Year 2019-20 -reg. For more information please see below link: Read more eRA Result for NTPC’s 1000 MW Hybrid Tranche-VI Bid – EQ