POSTPONEMENT OF THE PRE-BID MEETING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 750 MW AT ANDHRA PRADESH SOLAR POWER PROJECT This has reference to the RfS No. SECI/C&P/NSM/P-2/B-4/RFS/AP/012018/SP dated 05.01.2018 regarding Selection of Solar Power Developers for Setting up of 750 MW at Kadapa solar park at Andhra Pradesh Solar Power Projects […]