1. Home
  2. Tag "POSTPONEMENT OF THE RFS UPLOADING : DEVELOPMENT OF 250MW (50MW X 5) GRID CONNECTED SOLAR PV PROJECT AT THE DONDAICHA SOLAR PARK (PHASE-I)"

POSTPONEMENT OF THE RFS UPLOADING : DEVELOPMENT OF 250MW (50MW X 5) GRID CONNECTED SOLAR PV PROJECT AT THE DONDAICHA SOLAR PARK (PHASE-I), DONDAICHA, DIST. DHULE, MAHARASHTRA

This has reference to the NIT No. SECI/C&P/SPD/RfS/MAHAGENCO/042018 published dated 28.04.2018 regarding the RfS for Development of 250MW (50MW x 5) Grid Connected Solar PV Project at the Dondaicha Solar Park (Phase-I), Dondaicha, Dist. Dhule, Maharashtra. The RfS documents for the captioned NIT which was to be uploaded on 11.05.2018 by 1800 HRS has been […]

IIT Bhilai issue Tender for Site survey, DESITC of 475 kWp solar PV project on the rooftop of various buildings of IIT Bhilai, including O&M of the system for a period of 25 years under RESCO model – EQ

POSTPONEMENT OF THE RFS UPLOADING : DEVELOPMENT OF 250MW (50MW X 5) GRID CONNECTED SOLAR PV PROJECT AT THE DONDAICHA SOLAR PARK (PHASE-I), DONDAICHA, DIST. DHULE, MAHARASHTRA

This has reference to the NIT No. SECI/C&P/SPD/RfS/MAHAGENCO/042018 published dated 28.04.2018 regarding the RfS for Development of 250MW (50MW x 5) Grid Connected Solar PV Project at the Dondaicha Solar Park (Phase-I), Dondaicha, Dist. Dhule, Maharashtra. The RfS documents for the captioned NIT which was to be uploaded on 11.05.2018 by 1800 HRS has been […]

Odisha has power to generate 200 GW solar energy – EQ