POSTPONEMENT OF THE TENDER UPLOADING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 100MW (50MW X 2) GRID CONNECTED FLO This has reference to the NIT No. SECI/C&P/SPD/RfS/100MW FLOATING/UP/032018 published dated 16.03.2018 regarding the RfS Selection of Solar Power Developers for Setting up of 100MW (50MW x 2) Grid Connected Floating Solar Power […]