1. Home
  2. Tag "SECI ISSUES NIT FOR SETTING UP OF 14 MW SOLAR POWER PLANT WITH 42MWH BESS (7MW/21MWH EACH AT LEH AND KARGIL DIVISIONS)"

SECI ISSUES NIT FOR SETTING UP OF 14 MW SOLAR POWER PLANT WITH 42MWH BESS (7MW/21MWH EACH AT LEH AND KARGIL DIVISIONS)

The detailed Request for Selection Documents will be available on March 15, 2019. Solar Energy Corporation of India Ltd. (SECI) invites online bids for Setting up of Setting up of 14MW Solar Power Plant With 42MWh BESS (7MW/21MWh each At Leh and Kargil Divisions). The detailed Request for Selection Document (RfS) shall be available for […]

Union Minister Shri Pralhad Joshi Urges People to Take Advantage of PM-Surya Ghar: Muft Bijli Yojana – EQ