1. Home
  2. Tag "SECOND PRE-BID MEETING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 5GW (PER ANNUM) SOLAR MANUFACTURING PLANT LINKED WITH POWER PURCHASE AGREEMENTS (PPAS) FOR SOLAR PV POWER PLANT"

AMENDMENT-I, PPA AND PSA DOCUMENTS, SECOND PRE-BID MEETING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 5GW (PER ANNUM) SOLAR MANUFACTURING PLANT LINKED WITH POWER PURCHASE AGREEMENTS (PPAS) FOR SOLAR PV POWER PLANT

This has reference to the RfS No. SECI/C&P/RfS/5GW MANUFACTURING/P-1/052018 dated 25.05.2018 regarding the RfS for Selection of Solar Power Developers for Setting up of 5GW (Per Annum) Solar Manufacturing Plant linked with Power Purchase Agreements (PPAs) for Solar PV Power Plant under Global Competitive Bidding (Phase-I). The title of the tender has been revised and […]

World Bank Approves $122 Million to Boost Renewable Energy in Botswana – EQ

SECOND PRE-BID MEETING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 5GW (PER ANNUM) SOLAR MANUFACTURING PLANT LINKED WITH POWER PURCHASE AGREEMENTS (PPAS) FOR SOLAR PV POWER PLANT

This has reference to the RfS No. SECI/C&P/RfS/5GW MANUFACTURING/P-1/052018 dated 25.05.2018 regarding Selection of Solar Power Developers for Setting up of 5GW (Per Annum) Solar Manufacturing Plant linked with Power Purchase Agreements (PPAs) for ISTS Connected Solar PV Power Plant under Global Competitive Bidding (Phase-I). The pre-bid meeting for the subject tender has been organized on 22.06.2018 @ […]

World Bank Approves $122 Million to Boost Renewable Energy in Botswana – EQ