1. Home
  2. Tag "Setting up of 150 MW (50 MW x 3) Grid Connected Floating Solar Power Projects at Rihand Dam"

Setting up of 150 MW (50 MW x 3) Grid Connected Floating Solar Power Projects at Rihand Dam

Work Description Selection of Solar Power Developers for Setting up of 150 MW (50 MW x 3) Grid Connected Floating Solar Power Projects to be installed at Rihand Dam, Sonbhadra District, Uttar Pradesh under Global Competitive Bidding Tender Value in Rs.: 600 Crore For more information please see below link:

WBPDCL issue Tender for O&M of the rooftop solar PV plant 1.9 MWp under EMIPH and EMOPH dept on different buildings in KTPS for 02 years – EQ