1. Home
  2. Tag "Setting up of 150 MW (50 MW x 3) Grid Connected Floating Solar Power Projects at Rihand Dam"

Setting up of 150 MW (50 MW x 3) Grid Connected Floating Solar Power Projects at Rihand Dam

Work Description Selection of Solar Power Developers for Setting up of 150 MW (50 MW x 3) Grid Connected Floating Solar Power Projects to be installed at Rihand Dam, Sonbhadra District, Uttar Pradesh under Global Competitive Bidding Tender Value in Rs.: 600 Crore For more information please see below link:

NPCIL issue Tender for DSITC and post commissioning O&M of Grid Connected Roof Top Solar PV system of 495 KWp capacity – EQ