1. Home
  2. Tag "Shrinagar Hydro Electric Project"

Petition for Determination of Tariff for Control Period 2024 to 2029 for the 330 MW (4 x 82.5 MW) Shrinagar Hydro Electric Project under the PPA – EQ

Petition for Determination of Tariff for Control Period 2024 to 2029 for the 330 MW (4 x 82.5 MW) Shrinagar Hydro Electric Project under the PPA For more information please see below link:

Petition of the CERC (Conduct of Business) Regulations to extension of scheduled commission – EQ