1. Home
  2. Tag "SOLAR POWER PLANT ESTABLISHED AT COACH REBUILDING FACTORY"

SOLAR POWER PLANT ESTABLISHED AT COACH REBUILDING FACTORY

A solar power plant of 500 kW was established on March 23, 2018 at West Central Railway Bhopal division passenger coach re-building factory. The annual production would be 752000 Unit KW hour. The solar plant is established on 7832 square meter over the terrace of the factory. With installation of the solar plant, Rs 33 […]

Puducherry initiates rooftop solar bidding for 150,000 homes – EQ