1. Home
  2. Tag "SURAT"

Solex marks the commencement of its 1.5GW PV module mfg. facility with ground breaking ceremony near Surat

  A few months ago, Solex Energy Limited had announced the expansion of its solar module manufacturing facility to 1.5GW. The pandemic and the resulting call for being ‘Atma Nirbhar’ has propelled the plans for setting up the facility at a rapid pace. On the 19th October, 2020, Solex Energy earmarked the commencement of this […]

Union Minister Shri Pralhad Joshi Urges People to Take Advantage of PM-Surya Ghar: Muft Bijli Yojana – EQ

Guj sets 30,000 MW renewable energy generation target by 2022

Gujarat government has set a target of 30,000 MW of renewable energy generation by 2022 from the current 9,670 MW. “Gujarat will have over 30,000 MW of renewable energy by 2022, the roadmap for which has been finalised,” state’s chief secretary J N Singh told reporters here on Monday. At present, the state has a […]

Union Minister Shri Pralhad Joshi Urges People to Take Advantage of PM-Surya Ghar: Muft Bijli Yojana – EQ

Surat’s renewable energy capacity increases by 30% in 18 months

Surat: Renewable energy production capacity has seen an increase of 30 per cent in Surat in the past 18 months. Of the 25 crore units of electricity that the city produces, share of wind and solar energy is 90 per cent. Surat happens to be the only city in the country whose captive power generation […]

India’s Renewable Energy Sector Attracts Record Investment in 2023 – EQ

NIT FOR SUPPLY, INSTALLATION AND COMMISSIONING OF 1MWp GRID CONNECTED FLOATING SOLAR PV SYSTEM AT NTPC KAWAS RESERVOIR, ADITYANAGAR, SURAT, GUJARAT

NIT FOR SUPPLY, INSTALLATION AND COMMISSIONING OF 1MWp GRID CONNECTED FLOATING SOLAR PV SYSTEM AT NTPC KAWAS RESERVOIR, ADITYANAGAR, SURAT, GUJARAT For more information please see below link:

REC issue Tender for Setting up of Grid Connected 1 MW Ground Mounted Solar PV Plant with Arrangement of Land And STU Connectivity – EQ