The national power grid was prepared for the fall in demand and has been gradually scaling down thermal power generation in steps since 7.30 PM. In tandem power generation from gas-based and hydel generation units were being scaled up to maintain the balance. Kolkata: Almost 26 GW of demand dropped between 9:00 PM and 9:15 […]