1. Home
  2. Tag "Tranche-III"

Petition of Adoption of usage charges for 510 MW Solar PV Power Station (Tranche-III) connected to the Inter-State Transmission System under Central Power Sector – EQ

Petition of Adoption of usage charges for 510 MW Solar PV Power Station (Tranche-III) connected to the Inter-State Transmission System under Central Power Sector For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to the inter State Transmission System) Regulations of the conditions stipulated – EQ