Petition for Adoption of Transmission Charges with respect to the Transmission System being established by the Bikaner A Power Transmission Limited For more information please see below link:
Petition for Truing Up of Transmission Tariff Asset under “Transmission System for controlling High Loading of Nellore (PG)-Nellore D/C line” in Southern Region For more information please see below link:
Petition for Adoption of Transmission Charges with respect to the Transmission System being established by the South Olpad Transmission Limited For more information please see below link:
Petition for Adoption of Transmission Charges with respect to the Transmission System being established by the Barmer I Transmission Limited For more information please see below link:
Petition for Adoption of Transmission Charges “Transmission system for evacuation of power from Rajasthan REZ Ph-IV” being established by Rajasthan IV 4B Power Transmission Limited For more information please see below link:
Petition of the Electricity Act for Adoption of Transmission Charges with respect to the Transmission System being established by Pune – III Transmission Limited For more information please see below link:
Petition for Truing Up and determination of transmission tariff for the Line under “Transmission system associated with Kalpakkam PFBR (500 MW) project” in the Southern Region For more information please see below link:
Petition with the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 For more information please see below link:
Petition for Adoption of Transmission Charges to the Transmission System being established by the Khavda PS1 and 3 Transmission Limited For more information please see below link:
Petition for Adoption of Transmission Charges to the Transmission System being established by the Barmer I Transmission Limited For more information please see below link: