As per the Reassessment Study carried out by the Central Electricity Authority (CEA) during 1978-1987, the assessed hydro power potential in the country is about 145320 MW (for projects with capacity above 25 MW). Presently, 42104.6 MW (29%) out of 145320 MW has been developed and 15023.5 MW (10.3%) is under construction. The state wise […]