1. Home
  2. Tag "WBSEDCL"

WBSEDCL FOR ISSUANCE OF APPROPRIATE ORDER THE WBERC AS AMENDED SO THAT CONSUMERS OF WBSEDCL DOES NOT REQUIRE TO BEAR HIGH ENERGY COST OF THERMAL POWER STATION

IN THE MATTER OF APPLICATION MADE BY THE WBSEDCL FOR ISSUANCE OF APPROPRIATE ORDER THE WBERC AS AMENDED SO THAT CONSUMERS OF WBSEDCL DOES NOT REQUIRE TO BEAR HIGH ENERGY COST OF THERMAL POWER STATION. For more information please see below link:

In the Matter of UPERC the purposes of banking and withdrawal of banked energy – EQ

IN THE MATTER OF APPLICATION BY ULTRATECH CEMENT LIMITED SEEKING INTERVENTION OF THE COMMISSION IN REGARD TO RELEASE OF NOC BY WBSEDCL FOR WHEELING OF 7.425 MW AND 10.00 MW OF POWER – EQ Mag Pro

IN THE MATTER OF APPLICATION BY ULTRATECH CEMENT LIMITED SEEKING INTERVENTION OF THE COMMISSION IN REGARD TO RELEASE OF NOC BY WBSEDCL FOR WHEELING OF 7.425 MW AND 10.00 MW OF POWER BY ULTRATECH CEMENT LIMITED FROM THEIR CAPTIVE POWER PLANT AT BHATAPARA – BALODA BAZAR , CHHATTISGARH. For more information please see below link:

In the Matter of UPERC the purposes of banking and withdrawal of banked energy – EQ

In regard to the application submitted by the WBSEDCL for approval of the connection procedures for solar pv generating system under net metering – EQ Mag Pro

In regard to the application submitted by the WBSEDCL for approval of the connection procedures for solar pv generating system under net metering. For more information please see below link:

In the Matter of UPERC the purposes of banking and withdrawal of banked energy – EQ

Petition For Approval of Supplementary to the PPA and the WBSEDCL For Purchase of Entire Exportable Power of 05 MW From the PHASE-I Power Station of SIIPL – EQ Mag Pro

Petition For Approval of Supplementary to the PPA and the WBSEDCL For Purchase of Entire Exportable Power of 05 MW From the PHASE-I Power Station of SIIPL. For more information please see below link:

In the Matter of UPERC the purposes of banking and withdrawal of banked energy – EQ