1. Home
  2. Tag "Wind-Solar Hybrid Power Project"

Petition of the PPA for the development of 450 MW ISTS connected Wind-Solar Hybrid power project, entered between Adani Solar Energy Jaisalmer One Private Limited and SECI – EQ

Petition of the PPA for the development of 450 MW ISTS connected Wind-Solar Hybrid power project, entered between Adani Solar Energy Jaisalmer One Private Limited and SECI For more information please see below link:

Petition of the CERC (Sharing of inter- State Transmission Charges and Losses) and (Deviation Settlement Mechanism and related matters) Regulations, 2022 – EQ

SEMBCORP AWARDED 440 MW WIND-SOLAR HYBRID POWER PROJECT IN INDIA – EQ

– Addition of over 1.4GW of greenfield and brownfield projects in India since Sembcorp’s Investor Day 2023 Singapore : Sembcorp Industries (Sembcorp), through its wholly owned renewables subsidiary Green Infra Wind Energy Limited (GIWEL), has received the Letter of Award (LOA) for a 440MW Inter State Transmission System (ISTS) connected wind-solar hybrid power project (the […]

NTPC Solar – undersubscribed bid – EQ

RUMSL Issue Tender for Supply of 750 MW GRID CONNETCED WIND-SOLAR HYBRID POWER PROJECT IN MADHYA PRADESH – EQ

RUMSL Issue Tender for Supply of 750 MW GRID CONNETCED WIND-SOLAR HYBRID POWER PROJECT IN MADHYA PRADESH For more information please see below link: Tender Documents Date and Time of Start of Procurement of Tender Documents 28-Sep-2023 17:00:00 RTZ Corresponding Local Date and Time Not Applicable Date and Time of Closure of Procurement of Tender […]

NTPC issue Tender for Balance of System Package for Development of 1500 MW Grid Connected Solar PV Projects at RVUNLS Solar Park in Bikaner, Rajasthan – EQ

Petition of Power Purchase Agreement for the development of 300 MW ISTS connected Wind-Solar Hybrid power project – EQ Mag

Petition of Power Purchase Agreement for the development of 300 MW ISTS connected Wind-Solar Hybrid power project For more information please see below link:

Petition of the CERC (Sharing of inter- State Transmission Charges and Losses) and (Deviation Settlement Mechanism and related matters) Regulations, 2022 – EQ

Petition of PPA for the development of 300 MW ISTS connected Wind-Solar Hybrid power project entered between Adani Hybrid Energy Jaisalmer Three Limited and SECI – EQ Mag

Petition of PPA for the development of 300 MW ISTS connected Wind-Solar Hybrid power project entered between Adani Hybrid Energy Jaisalmer Three Limited and SECI. For more information please see below link:

Petition of the CERC (Sharing of inter- State Transmission Charges and Losses) and (Deviation Settlement Mechanism and related matters) Regulations, 2022 – EQ

Petition for adoption of tariff for the 1110 MW Wind-Solar Hybrid Power Project (Tranche-III) connected to the inter-State Transmission System – EQ Mag Pro

Petition for adoption of tariff for the 1110 MW Wind-Solar Hybrid Power Project (Tranche-III) connected to the inter-State Transmission System. For more information please see below link:

Petition of the CERC (Sharing of inter- State Transmission Charges and Losses) and (Deviation Settlement Mechanism and related matters) Regulations, 2022 – EQ