Petition for adoption of tariff for the 1110 MW Wind-Solar Hybrid Power Project (Tranche-III) connected to the inter-State Transmission System – EQ Mag Pro November 29, 2021 Anand Gupta 000 Policy & Regulation Petition for adoption of tariff for the 1110 MW Wind-Solar Hybrid Power Project (Tranche-III) connected to the inter-State Transmission System. For more information please see below link: Read more Petition of the GERC (Terms and Conditions of Intra-State Open Access) and (Terms and Conditions for Green Energy Open Access) and (Conduct of Business), Regulations – EQ