Petition for adoption of tariff discovered under Competitive Bidding Process for Procurement of Power from Grid connected Wind Solar Hybrid Power Projects For more information please see below link:
SJVN Limited Issue Tender for Supply of 1.2 GW ISTS-connected Wind-Solar Hybrid Power Projects in India under Tariff-Based Competitive Bidding For more information please see below link: Tender Documents Date and Time of Start of Procurement of Tender Documents 12-Jul-2024 18:00:00 RTZ Corresponding Local Date and Time Not Applicable Date and Time of Closure […]
RfS for Selection of Hybrid Power Developers for Setting up of 1200 MW ISTS-connected Wind-Solar Hybrid Power Projects in India under Tariff-Based Competitive Bidding (SECI-Tranche-VIII) has been issued under the Standard Bidding Guidelines. The detailed RfS document has been uploaded on https://www.bharat-electronictender.com (Only viewed on Microsoft Internet explorer 10.x or above browser) and under “Tenders” […]
SJVN Issue Tender for Supply of 1.5 GW ISTS-connected Wind-Solar Hybrid Power Projects in India under Tariff-Based Competitive Bidding For more information please see below link:
NTPC Limited Issue Tender for Supply of 1 GW POWER FROM ISTS-CONNECTED WIND SOLAR HYBRID POWER PROJECTS ANYWHERE IN INDIA (NTPC-Tranche-V) For more information please see below link: Tender Documents Date and Time of Start of Procurement of Tender Documents 01-Feb-2024 18:00:00 RTZ Corresponding Local Date and Time 01-Feb-2024 18:00:00 IST Date and Time […]
NHPC Limited Issue Tender for Supply of 1.5 GW power from ISTS connected Wind Solar Hybrid Power Projects system on anywhere in India For more information please see below link:
RfS for Selection of Hybrid Power Developers for Setting up of 2000 MW ISTS-connected Wind-Solar Hybrid Power Projects in India under Tariff-Based Competitive Bidding (SECI-Tranche-VII) has been issued under the Standard Bidding Guidelines. The detailed RfS document has been uploaded on https://www.bharat-electronictender.com (Only viewed on Microsoft Internet explorer 10.x or above browser) and under “Tenders” […]
Results of e-RA: RfS for setting up of 1200 MW ISTS-Connected Wind-Solar Hybrid Power Projects with assured Peak Power Supply in India (Tranche-VI). For more information please see below link: