TANGEDCO is directed to verify the claim made by the petitioner & settle within 30 days with interest at 12% P.A.
0
0
TANGEDCO is directed to verify the claim made by the petitioner and after deducting the amount already paid, settle the same within 30 days from the date of this order together with interest at 12% per annum from the date of filing of this petition till realisation. In the circumstances, there will be no order as to costs.
For more information please see below link.
Related posts:
- Order – Grant connectivity and net metering to the petitioner for the implementation of 4 MWp Roof Top Solar Project for Southern Railway
- To accord approval for the proposed implementation of the KUSUM (Component C) Agricultural Solar Pump Scheme in 20,000 pump sets with 7.5 H.P load by installing 11 kW solar PV plant in each of the pump sets
- BTN Solar to issue appropriate direction to the respondent complete construction of requisite infrastructure beyond the Delivery Point required for evacuation of the entire contracted capacity of 100 MWs
- TNERC Rejects VSR Solar Power Petition for Extending Project Commissioning Deadline