Tender for Feasibility study of Solar Power Plant 1MW Grid connected
Subject to force majeure and the extensions as may be allowed due to changes in work, Consultant guarantees to complete the work in agreed time schedule. In the event of the CONSULTANT failing to complete the work within the agreed time schedule for reasons solely attributable to Consultant, Consultant agrees to pay to HMT, Kalamassery a compensation equal to 0.5% (half percent) of its fees for every completed week of delay exceeding 1 weeks of the stipulated period subject to a maximum of 10% (Ten percent) of Consultant‟s fees, for all such delays. The decision of competent authority of HMT, Kalamassery is final & binding in this regard. The overall delay shall be accounted for working out the penalty for completion of total assigned job consisting of various activities.
For More Information Pls.Go Through Below Attached Documents…
Related posts:
- Installation of total 4 MWp Rooftop solar system (ranging from 50 KWp to 410 KWp) at different locations of Mumbai, Pune, Solapur, Bhusawal and Nagpur Division of Central Rail
- POSTPONEMENT OF DATE OF UPLOADING OF TENDER DOCUMENTS: NIT NO. SECI/SD/NIT/2017/PMDP J&K DATED 27/07/2017
- SOIL INVESTIGATION FOR INSTALLATION OF 01 MW SOLAR PHOTO VOLTAIC PLANT AT INS CHILKA
- Establishment of roof top based Solar Power Plant (150 KWp) at C.A. Porbandar