The first installation at MIT Talegaon Campus out of a total capacity of 4 MW. This system is synchronised with DG set and will control the output of solar as per load and DG reserve capacity using a special controller. It is a great honour to be working as the Lead Consultant for this entire project…Amit Rane
101
0