1. Home
  2. Policy & Regulation
  3. To accord approval for the proposed implementation of the KUSUM (Component C) Agricultural Solar Pump Scheme in 20,000 pump sets with 7.5 H.P load by installing 11 kW solar PV plant in each of the pump sets
To accord approval for the proposed implementation of the KUSUM (Component C) Agricultural Solar Pump Scheme in 20,000 pump sets with 7.5 H.P load by installing 11 kW solar PV plant in each of the pump sets

To accord approval for the proposed implementation of the KUSUM (Component C) Agricultural Solar Pump Scheme in 20,000 pump sets with 7.5 H.P load by installing 11 kW solar PV plant in each of the pump sets

0
0

 

Tamil Nadu Energy Development Agency (TEDA)/ To accord approval for the proposed implementation of the KUSUM (Component C) Agricultural Solar Pump Scheme in 20,000 pump sets with 7.5 H.P load by installing 11 kW solar PV plant in each of the pump sets.

ORDER

1. Prayer of the Petitioner in M.P. No.2 of 2020:-

The prayer of the Petitioner in M.P. No. 2 of 2020 is:
(a) To accord approval for the proposed implementation of the KUSUM (Component C) Agricultural Solar Pump Scheme in 20,000 pump sets with 7.5 H.P load by installing 11 kW solar PV plant in each of the pump sets.

(b) To approve a maximum / bench mark tariff of Rs.4.53 per unit (which includes Rs.1.00 incentive to farmer for net energy injected to the grid) for the gross unit generated by the proposed solar PV plant erected under this scheme.

(c) To permit the TEDA, the RESCO for the project, to finalize the investment proposal or tariff based reverse bidding process and submit the final tariff rate for the approval of the Commission.

(d) To approve to ensure “must-run” status by TANGEDCO to the solarised feeders of the scheme and keep such feeders „ON‟ during  Page 3 of 42 sunshine hours of daytime.

(e) To approve required modification, improvement to the TANGEDCO network for successful implementation of the project and

(f) To pass any other order as the Commission deems fit and appropriate considering the special nature of the project.

For more information please see below link:

Anand Gupta Editor - EQ Int'l Media Network