To seek approval for procurement of 1200 MW power on long term basis i.e.25 years from solar power projects with committed power supply from Energy Storage Systems – EQ Mag
0
0
To seek approval for procurement of 1200 MW power on long term basis i.e.25 years from solar power projects with committed power supply from Energy Storage Systems.
For more information please see below link:
Related posts:
- Discussion Paper on Framework for Large Scale Integration of Renewable Energy using Energy Storage Systems and its impact on Tariffs – EQ Mag Pro
- Petition For Adoption of Tariff For 1070 MW Solar PV Power
- SECI offers 9 GW solar power projects to Andhra Pradesh – EQ Mag Pro
- In the matter of: ADANI POWER RAJASTHAN LIMITED VERSUS RAJASTHAN ELECTRICITY REGULATORY COMMISSION – EQ Mag