Transmission Scheme for evacuation of 4550MW Solar Power in Phase – I from the proposed 10,000 MW Solar parks by G.O.A.P
Augmentation of ICT capacity and erection of 4No.220kV Bay extensions at Talaricheruvu 400/220kV Sub-Station. (2) 2No.220kV Bay extensions at Jammalamadugu 400/220 kV Sub-Station (3)Construction of 220kV Switching Station at Mudigubba.
For more information please see below link:
Related posts:
- GAIL/SECI/PC/W-171/SOLAR PV/2016 (E-Tender No. 8000010172) Design, Engineering, Manufacture, Supply, Storage, Civil Work, Erection, Testing & Commissioning of 5.76 MWp (DC) Grid connected Rooftop solar PV Plant including O&M of the Plant for a period of 5 years
- EXTENSION OF BID SUBMISSION DATE FOR 750 MW SOLAR PV PROJECTS AT BHADLA SOLAR PARK, RAJASTHAN
- Providing and installation of solar power plant of sultan chusku post of 5bn itbp leh SH- Providing and installation of solar power plant of10 KVA
- PROVN OF 50 KW ON GRID SPV SOLAR GENERATION SYSTEM AT PCDA BUILDING SECTOR 9C CHANDIGARH UNDER GE CHANDIGARH